Fire Escape 8
Bradfabs were awarded this technically challenging job which involved removing the old rotten steel staircase in sections and on a weekend with difficult access.
The replacement fire escape was installed in sections over a period of 3 days to enable access to 3 floors of offices within a factory.
Fitted in London.
To view this item within our Ebay store please click the following link: http://stores.ebay.co.uk/bradfabs
Approximate Cost: £
Estimated Time Lead: 4-6 weeks
#24171